San Mateo Caltrain Station
385 1st Ave, San Mateo, CA 94401
- Max power
- 50 kW
- DC fast
- Charging ports
- 2
- CCS1, CHAdeMO
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
San Mateo Caltrain Station is a DC fast-charging station run by EVgo at 385 1st Ave in San Mateo, CA. It has 2 charging ports with CCS1 and CHAdeMO connectors and delivers up to 50 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~76min
Range added in 15 minutes
~35mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CHAdeMO
2 ports · 50 kW
DC fast
An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.
Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.
CCS1
2 ports · 50 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Price not listed
Prices can vary by time of day and membership. The EVgo app shows the live rate before you start.
Location and access
- Address
- 385 1st Ave
San Mateo, CA 94401 - Coordinates
- 37.56750, -122.32378
- Hours
- 24/7
- Phone
- 877-455-3833
- Network
- EVgo
- On site
- 24/7 Access
Questions drivers ask
How fast is San Mateo Caltrain Station?
It delivers up to 50 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at San Mateo Caltrain Station?
EVgo has not published a fixed price for this site. Rates are shown in the EVgo app or on the charger screen before you start a session.
What plugs does San Mateo Caltrain Station have?
2 × CHAdeMO up to 50 kW; 2 × CCS1 (Combined Charging System) up to 50 kW.
Is San Mateo Caltrain Station open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 228411. Last confirmed by the network on Oct 10, 2026; opened Mar 7, 2018.