Skip to content
ChargePulse
High-power DC Nayax Energy

Windmill Market

301 The Alameda, San Juan Bautista, CA 95045

Max power
180 kW
High-power DC
Charging ports
12
CCS1, NACS
Price
$0.44/kWh
Per network listing
Hours
24/7
Open all day

Windmill Market is a DC fast-charging station run by Nayax Energy at 301 The Alameda in San Juan Bautista, CA. It has 12 charging ports with CCS1 and NACS connectors and delivers up to 180 kw. Listed pricing is $0.44/kWh, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~90mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

6 ports · 180 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NACS

6 ports · 180 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

Pricing

$0.44/kWh

Network listing: “$0.44 per kWh + $1 connection”

A 10% to 80% session (about 54 kWh) costs roughly $23.72 before taxes and idle fees.

Location and access

Address
301 The Alameda
San Juan Bautista, CA 95045
Coordinates
36.84133, -121.53501
Hours
24/7
On site
ShoppingFood / RestaurantsRestrooms24/7 Access

Questions drivers ask

How fast is Windmill Market?

It delivers up to 180 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Windmill Market?

The listed rate is $0.44/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $24 before taxes and idle fees.

What plugs does Windmill Market have?

6 × CCS1 (Combined Charging System) up to 180 kW; 6 × NACS (SAE J3400) up to 180 kW.

Is Windmill Market open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 448679. Last confirmed by the network on Aug 11, 2026; opened Dec 15, 2025.