Revel Mission District
199 Erie St, San Francisco, CA 94103
- Max power
- 320 kW
- Ultra-fast DC
- Charging ports
- 6
- CCS1, NACS
- Price
- $0.39/kWh
- Per network listing
- Hours
- 24/7
- Open all day
Revel Mission District is a DC fast-charging station run by Revel at 199 Erie St in San Francisco, CA. It has 6 charging ports with CCS1 and NACS connectors and delivers up to 320 kw. Listed pricing is $0.39/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~90mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
6 ports · 320 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
NACS
6 ports · 320 kW
DC fast
The North American Charging Standard, Tesla's plug, now adopted by most automakers.
Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.
Pricing
$0.39/kWh
Network listing: “$0.39 per kWh + tax; app discounts and time of use rates available”
A 10% to 80% session (about 54 kWh) costs roughly $21.02 before taxes and idle fees.
Location and access
- Address
- 199 Erie St
San Francisco, CA 94103 - Coordinates
- 37.76892, -122.41975
- Hours
- 24/7
- Network
- Revel
- On site
- 24/7 Access
Questions drivers ask
How fast is Revel Mission District?
It delivers up to 320 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Revel Mission District?
The listed rate is $0.39/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $21 before taxes and idle fees.
What plugs does Revel Mission District have?
6 × CCS1 (Combined Charging System) up to 320 kW; 6 × NACS (SAE J3400) up to 320 kW.
Is Revel Mission District open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 390510. Last confirmed by the network on Feb 13, 2026; opened Mar 26, 2025.