Artichoke Joe's Casino
659 Huntington Ave, San Bruno, CA 94066
- Max power
- 100 kW
- DC fast
- Charging ports
- 22
- CCS1, J1772
- Price
- $0.55-0.65/kWh
- Per network listing
- Hours
- 24/7
- Open all day
Artichoke Joe's Casino is a DC fast-charging station run by Evolv Charging at 659 Huntington Ave in San Bruno, CA. It has 22 charging ports with CCS1 and J1772 connectors and delivers up to 100 kw. Listed pricing is $0.55-0.65/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~52min
Range added in 15 minutes
~51mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
2 ports · 100 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
J1772
20 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
$0.55-0.65/kWh
Network listing: “$0.65 per kWh for DC charging, $0.55 per kWh for L2 charging”
A 10% to 80% session (about 54 kWh) costs roughly $29.65 to $35.04 before taxes and idle fees.
Location and access
- Address
- 659 Huntington Ave
San Bruno, CA 94066 - Coordinates
- 37.62771, -122.41073
- Hours
- 24/7
- Phone
- 866-949-9606
- Network
- Evolv Charging
- On site
- 24/7 Access
Questions drivers ask
How fast is Artichoke Joe's Casino?
It delivers up to 100 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 52 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Artichoke Joe's Casino?
The listed rate is $0.55-0.65/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $30 to $35 before taxes and idle fees.
What plugs does Artichoke Joe's Casino have?
2 × CCS1 (Combined Charging System) up to 100 kW; 20 × J1772 (Type 1) up to 7 kW.
Is Artichoke Joe's Casino open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 470278. Last confirmed by the network on Sep 28, 2026; opened Jun 25, 2026.