Skip to content
ChargePulse
Ultra-fast DC EVgo

Savings Place Plaza

6519 Savings Pl, Sacramento, CA 95828

Max power
350 kW
Ultra-fast DC
Charging ports
6
CCS1, NACS
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Savings Place Plaza is a DC fast-charging station run by EVgo at 6519 Savings Pl in Sacramento, CA. It has 6 charging ports with CCS1 and NACS connectors and delivers up to 350 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~90mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

4 ports · 350 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NACS

2 ports · 350 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

Pricing

Price not listed

Prices can vary by time of day and membership. The EVgo app shows the live rate before you start.

Location and access

Address
6519 Savings Pl
Sacramento, CA 95828
Coordinates
38.50142, -121.42825
Hours
24/7
Network
EVgo
On site
24/7 Access

Questions drivers ask

How fast is Savings Place Plaza?

It delivers up to 350 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Savings Place Plaza?

EVgo has not published a fixed price for this site. Rates are shown in the EVgo app or on the charger screen before you start a session.

What plugs does Savings Place Plaza have?

4 × CCS1 (Combined Charging System) up to 350 kW; 2 × NACS (SAE J3400) up to 350 kW.

Is Savings Place Plaza open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 417464. Last confirmed by the network on Oct 10, 2026; opened Aug 3, 2025.