Skip to content
ChargePulse
DC fast Independent

Sacramento Municipal Utility District

6151 S St, Sacramento, CA 95817

Max power
Up to 50 kW
DC fast
Charging ports
16
CCS1, CHAdeMO, NEMA 5-20
Price
$0.23/kWh
Per network listing
Hours
24/7
Open all day

Sacramento Municipal Utility District is a DC fast-charging station run by Independent at 6151 S St in Sacramento, CA. It has 16 charging ports with CCS1, CHAdeMO and NEMA 5-20 connectors and delivers up to 50 kw. Listed pricing is $0.23/kWh, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~76min

Range added in 15 minutes

~35mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 50 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

1 port · 50 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NEMA 5-20

15 ports · 1 kW

AC

A 120 V, 20 A outlet. Slightly faster than a standard household plug.

Works with: Any EV with its portable Level 1 cord.

Pricing

$0.23/kWh

Network listing: “$0.23 per kWh”

A 10% to 80% session (about 54 kWh) costs roughly $12.40 before taxes and idle fees.

Location and access

Address
6151 S St
Sacramento, CA 95817
Coordinates
38.55313, -121.43430
Finding the chargers
65 St and S St
Hours
24/7Drivers must bring their own J1772 cordset for Level 1 charging
On site
24/7 Access

Questions drivers ask

How fast is Sacramento Municipal Utility District?

It delivers up to 50 kW (estimated from the network's typical hardware). A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Sacramento Municipal Utility District?

The listed rate is $0.23/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $12 before taxes and idle fees.

What plugs does Sacramento Municipal Utility District have?

1 × CHAdeMO up to 50 kW; 1 × CCS1 (Combined Charging System) up to 50 kW; 15 × NEMA 5-20 outlet up to 1 kW.

Is Sacramento Municipal Utility District open 24/7?

Yes, the network lists it as open 24 hours a day. Note: Drivers must bring their own J1772 cordset for Level 1 charging.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 60856. Last confirmed by the network on Sep 14, 2026; opened Mar 24, 2014.