Oracle Rwshore 50P-014 Lev-3
500 Oracle Parkway 500 Oracle Parkway, Redwood City, CA 94065
- Max power
- 50 kW
- DC fast
- Charging ports
- 1
- CCS1, CHAdeMO
- Price
- Price not listed
- Per network listing
- Hours
- See hours
- Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm
Oracle Rwshore 50P-014 Lev-3 is a DC fast-charging station run by ChargePoint at 500 Oracle Parkway 500 Oracle Parkway in Redwood City, CA. It has 1 charging port with CCS1 and CHAdeMO connectors and delivers up to 50 kw. Pricing is set by the network app.
How long will charging take?
10% to 80%, 77 kWh battery
~76min
Range added in 15 minutes
~35mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CHAdeMO
1 port · 50 kW
DC fast
An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.
Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.
CCS1
1 port · 50 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Price not listed
Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.
Location and access
- Address
- 500 Oracle Parkway 500 Oracle Parkway
Redwood City, CA 94065 - Coordinates
- 37.53114, -122.26231
- Finding the chargers
- Building 500 exterior parking lot
- Hours
- Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm
- Phone
- 888-758-4389
- Network
- ChargePoint
Questions drivers ask
How fast is Oracle Rwshore 50P-014 Lev-3?
It delivers up to 50 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Oracle Rwshore 50P-014 Lev-3?
ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.
What plugs does Oracle Rwshore 50P-014 Lev-3 have?
1 × CHAdeMO up to 50 kW; 1 × CCS1 (Combined Charging System) up to 50 kW.
Is Oracle Rwshore 50P-014 Lev-3 open 24/7?
Listed hours: Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 390557. Last confirmed by the network on Oct 10, 2026; opened Apr 22, 2025.