Skip to content
ChargePulse
DC fast ChargePoint

In-N-Out Lugonia 05

1301 West Lugonia Avenue, Redlands, CA 92374

Max power
125 kW
DC fast
Charging ports
1
CCS1, NACS
Price
Price not listed
Per network listing
Hours
24/7
Open all day

In-N-Out Lugonia 05 is a DC fast-charging station run by ChargePoint at 1301 West Lugonia Avenue in Redlands, CA. It has 1 charging port with CCS1 and NACS connectors and delivers up to 125 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~42min

Range added in 15 minutes

~64mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

1 port · 125 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NACS

1 port · 125 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
1301 West Lugonia Avenue
Redlands, CA 92374
Coordinates
34.06980, -117.20244
Finding the chargers
Van accessible
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is In-N-Out Lugonia 05?

It delivers up to 125 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 42 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at In-N-Out Lugonia 05?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does In-N-Out Lugonia 05 have?

1 × CCS1 (Combined Charging System) up to 125 kW; 1 × NACS (SAE J3400) up to 125 kW.

Is In-N-Out Lugonia 05 open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 404650. Last confirmed by the network on Oct 10, 2026; opened Jun 27, 2025.