Skip to content
ChargePulse
Ultra-fast DC Electrify America

BOA Paso Robles CA1-109 (Paso Robles, CA)

1511 Spring Street, Paso Robles, CA 93446

Max power
350 kW
Ultra-fast DC
Charging ports
4
CCS1
Price
Price not listed
Per network listing
Hours
24/7
Open all day

BOA Paso Robles CA1-109 (Paso Robles, CA) is a DC fast-charging station run by Electrify America at 1511 Spring Street in Paso Robles, CA. It has 4 charging ports with CCS1 connectors and delivers up to 350 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~90mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

4 ports · 350 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The Electrify America app shows the live rate before you start.

Location and access

Address
1511 Spring Street
Paso Robles, CA 93446
Coordinates
35.63035, -120.69210
Hours
24/7
Highway
CA-1
On site
24/7 Access

Questions drivers ask

How fast is BOA Paso Robles CA1-109 (Paso Robles, CA)?

It delivers up to 350 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at BOA Paso Robles CA1-109 (Paso Robles, CA)?

Electrify America has not published a fixed price for this site. Rates are shown in the Electrify America app or on the charger screen before you start a session.

What plugs does BOA Paso Robles CA1-109 (Paso Robles, CA) have?

4 × CCS1 (Combined Charging System) up to 350 kW.

Is BOA Paso Robles CA1-109 (Paso Robles, CA) open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 150384. Last confirmed by the network on Oct 11, 2026; opened Dec 20, 2019.