Skip to content
ChargePulse
DC fast Powerflex

Airport Corporate Center

7677 Oakport St, Oakland, CA 94621

Max power
Up to 50 kW
DC fast
Charging ports
36
J1772, NACS
Price
$0.20/kWh
Per network listing
Hours
24/7
Open all day

Airport Corporate Center is a DC fast-charging station run by Powerflex at 7677 Oakport St in Oakland, CA. It has 36 charging ports with J1772 and NACS connectors and delivers up to 50 kw. Listed pricing is $0.20/kWh, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~76min

Range added in 15 minutes

~35mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

NACS

5 ports · 50 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

J1772

31 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

$0.20/kWh

Network listing: “$0.20 per kWh”

A 10% to 80% session (about 54 kWh) costs roughly $10.78 before taxes and idle fees.

Location and access

Address
7677 Oakport St
Oakland, CA 94621
Coordinates
37.74652, -122.20413
Hours
24/7
Network
Powerflex
On site
24/7 Access

Questions drivers ask

How fast is Airport Corporate Center?

It delivers up to 50 kW (estimated from the network's typical hardware). A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Airport Corporate Center?

The listed rate is $0.20/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $11 before taxes and idle fees.

What plugs does Airport Corporate Center have?

5 × NACS (SAE J3400) up to 50 kW; 31 × J1772 (Type 1) up to 7 kW.

Is Airport Corporate Center open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 352348. Last confirmed by the network on Sep 12, 2024; opened Aug 7, 2024.