Smart & Final Extra!
1801 H St, Modesto, CA 95354
- Max power
- 350 kW
- Ultra-fast DC
- Charging ports
- 18
- CCS1
- Price
- $0.44/kWh
- Per network listing
- Hours
- 24/7
- Open all day
Smart & Final Extra! is a DC fast-charging station run by Nayax Energy at 1801 H St in Modesto, CA. It has 18 charging ports with CCS1 connectors and delivers up to 350 kw. Listed pricing is $0.44/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~90mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
18 ports · 350 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
$0.44/kWh
Network listing: “$0.44 per kWh + $1 connection”
A 10% to 80% session (about 54 kWh) costs roughly $23.72 before taxes and idle fees.
Location and access
- Address
- 1801 H St
Modesto, CA 95354 - Coordinates
- 37.64473, -120.99086
- Hours
- 24/7
- Phone
- 408-426-5420
- Network
- Nayax Energy
- On site
- ShoppingFood / RestaurantsRestrooms24/7 Access
Questions drivers ask
How fast is Smart & Final Extra!?
It delivers up to 350 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Smart & Final Extra!?
The listed rate is $0.44/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $24 before taxes and idle fees.
What plugs does Smart & Final Extra! have?
18 × CCS1 (Combined Charging System) up to 350 kW.
Is Smart & Final Extra! open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 448678. Last confirmed by the network on Jan 13, 2026; opened Jun 1, 2025.