Skip to content
ChargePulse
DC fast Red E

Del Rio Country Club

801 Stewart Rd, Modesto, CA 95356

Max power
43.2 kW
DC fast
Charging ports
8
CCS1
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Del Rio Country Club is a DC fast-charging station run by Red E at 801 Stewart Rd in Modesto, CA. It has 8 charging ports with CCS1 connectors and delivers up to 43.2 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~88min

Range added in 15 minutes

~30mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

8 ports · 43 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The Red E app shows the live rate before you start.

Location and access

Address
801 Stewart Rd
Modesto, CA 95356
Coordinates
37.74356, -121.00414
Hours
Not listed
Network
Red E

Questions drivers ask

How fast is Del Rio Country Club?

It delivers up to 43 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 88 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Del Rio Country Club?

Red E has not published a fixed price for this site. Rates are shown in the Red E app or on the charger screen before you start a session.

What plugs does Del Rio Country Club have?

8 × CCS1 (Combined Charging System) up to 43 kW.

Is Del Rio Country Club open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 462442. Last confirmed by the network on Oct 11, 2026; opened May 7, 2026.