Skip to content
ChargePulse
DC fast ChargePoint

DC Corridor Lodi Target DC1

2355 W Kettleman Ln, Lodi, CA 95242

Max power
80 kW
DC fast
Charging ports
1
CCS1, CHAdeMO
Price
Price not listed
Per network listing
Hours
24/7
Open all day

DC Corridor Lodi Target DC1 is a DC fast-charging station run by ChargePoint at 2355 W Kettleman Ln in Lodi, CA. It has 1 charging port with CCS1 and CHAdeMO connectors and delivers up to 80 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~65min

Range added in 15 minutes

~41mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 80 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

1 port · 80 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
2355 W Kettleman Ln
Lodi, CA 95242
Coordinates
38.11691, -121.30301
Finding the chargers
In the Target parking lot near the Tienda Dr entrance
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is DC Corridor Lodi Target DC1?

It delivers up to 80 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 65 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at DC Corridor Lodi Target DC1?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does DC Corridor Lodi Target DC1 have?

1 × CHAdeMO up to 80 kW; 1 × CCS1 (Combined Charging System) up to 80 kW.

Is DC Corridor Lodi Target DC1 open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 180947. Last confirmed by the network on Oct 11, 2026; opened Jan 27, 2021.