Skip to content
ChargePulse
DC fast ChargePoint

DC Corridor Tejon Ranch DC3

5521 Dennis McCarthy Dr, Lebec, CA 93243

Max power
50 kW
DC fast
Charging ports
1
CCS1, NACS
Price
Price not listed
Per network listing
Hours
24/7
Open all day

DC Corridor Tejon Ranch DC3 is a DC fast-charging station run by ChargePoint at 5521 Dennis McCarthy Dr in Lebec, CA. It has 1 charging port with CCS1 and NACS connectors and delivers up to 50 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~76min

Range added in 15 minutes

~35mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

1 port · 50 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NACS

1 port · 50 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
5521 Dennis McCarthy Dr
Lebec, CA 93243
Coordinates
34.98816, -118.94720
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is DC Corridor Tejon Ranch DC3?

It delivers up to 50 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at DC Corridor Tejon Ranch DC3?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does DC Corridor Tejon Ranch DC3 have?

1 × CCS1 (Combined Charging System) up to 50 kW; 1 × NACS (SAE J3400) up to 50 kW.

Is DC Corridor Tejon Ranch DC3 open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 200935. Last confirmed by the network on Oct 11, 2026; opened Nov 10, 2021.