The Burke Co LLC
3300 Coach Ln, Cameron Park, CA 95682
- Max power
- 100 kW
- DC fast
- Charging ports
- 12
- CCS1, CHAdeMO, J1772
- Price
- $0.61/kWh
- Per network listing
- Hours
- 24/7
- Open all day
The Burke Co LLC is a DC fast-charging station run by Evolv Charging at 3300 Coach Ln in Cameron Park, CA. It has 12 charging ports with CCS1, CHAdeMO and J1772 connectors and delivers up to 100 kw. Listed pricing is $0.61/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~52min
Range added in 15 minutes
~51mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CHAdeMO
8 ports · 100 kW
DC fast
An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.
Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.
CCS1
8 ports · 100 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
J1772
4 ports · 19 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
$0.61/kWh
Network listing: “$0.61 per kWh”
A 10% to 80% session (about 54 kWh) costs roughly $32.88 before taxes and idle fees.
Location and access
- Address
- 3300 Coach Ln
Cameron Park, CA 95682 - Coordinates
- 38.65734, -120.97236
- Hours
- 24/7
- Phone
- 866-949-9606
- Network
- Evolv Charging
- On site
- 24/7 Access
Questions drivers ask
How fast is The Burke Co LLC?
It delivers up to 100 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 52 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at The Burke Co LLC?
The listed rate is $0.61/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $33 before taxes and idle fees.
What plugs does The Burke Co LLC have?
8 × CHAdeMO up to 100 kW; 8 × CCS1 (Combined Charging System) up to 100 kW; 4 × J1772 (Type 1) up to 19 kW.
Is The Burke Co LLC open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 470346. Last confirmed by the network on Sep 23, 2026; opened Apr 18, 2025.