Skip to content
ChargePulse
DC fast Blink

Gwatney Buick GMC

5700 Landers Rd., North Little Rock, AR 72117

Max power
120 kW
DC fast
Charging ports
4
CCS1
Price
Free
No charging fee listed
Hours
24/7
Open all day

Gwatney Buick GMC is a DC fast-charging station run by Blink at 5700 Landers Rd. in North Little Rock, AR. It has 4 charging ports with CCS1 connectors and delivers up to 120 kw. Charging is free, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~43min

Range added in 15 minutes

~61mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

4 ports · 120 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Free

Network listing: “Free”

Location and access

Address
5700 Landers Rd.
North Little Rock, AR 72117
Coordinates
34.80760, -92.20703
Hours
24/7
Network
Blink
On site
24/7 Access

Questions drivers ask

How fast is Gwatney Buick GMC?

It delivers up to 120 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 43 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Gwatney Buick GMC?

Charging is listed as free. Parking fees or time limits may still apply.

What plugs does Gwatney Buick GMC have?

4 × CCS1 (Combined Charging System) up to 120 kW.

Is Gwatney Buick GMC open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 213447. Last confirmed by the network on Oct 11, 2026; opened Apr 5, 2022.