Porsche - Tucson
4690 E 22nd St, Tucson, AZ 85711
- Max power
- 350 kW
- Ultra-fast DC
- Charging ports
- 2
- CCS1
- Price
- Price not listed
- Per network listing
- Hours
- See hours
- 7am-5:30pm daily
Porsche - Tucson is a DC fast-charging station run by Independent at 4690 E 22nd St in Tucson, AZ. It has 2 charging ports with CCS1 connectors and delivers up to 350 kw. Pricing is set by the network app, and the site is open 7am-5:30pm daily.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~90mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
2 ports · 350 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Price not listed
Prices can vary by time of day and membership. The Independent app shows the live rate before you start.
Location and access
- Address
- 4690 E 22nd St
Tucson, AZ 85711 - Coordinates
- 32.20660, -110.89325
- Hours
- 7am-5:30pm daily
- Phone
- 520-849-8590
- On site
- Restrooms
Questions drivers ask
How fast is Porsche - Tucson?
It delivers up to 350 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Porsche - Tucson?
Independent has not published a fixed price for this site. Rates are shown in the Independent app or on the charger screen before you start a session.
What plugs does Porsche - Tucson have?
2 × CCS1 (Combined Charging System) up to 350 kW.
Is Porsche - Tucson open 24/7?
Listed hours: 7am-5:30pm daily.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 256648. Last confirmed by the network on Dec 12, 2025; opened Feb 28, 2023.