ReCharge Alaska - Delta Junction
265 Richardson Hwy, Delta Junction, AK 99737
- Max power
- 120 kW
- DC fast
- Charging ports
- 2
- CCS1, NACS
- Price
- $0.55/kWh
- Per network listing
- Hours
- 24/7
- Open all day
ReCharge Alaska - Delta Junction is a DC fast-charging station run by Independent at 265 Richardson Hwy in Delta Junction, AK. It has 2 charging ports with CCS1 and NACS connectors and delivers up to 120 kw. Listed pricing is $0.55/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~43min
Range added in 15 minutes
~61mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
2 ports · 120 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
NACS
2 ports · 120 kW
DC fast
The North American Charging Standard, Tesla's plug, now adopted by most automakers.
Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.
Pricing
$0.55/kWh
Network listing: “$0.55 per kWh”
A 10% to 80% session (about 54 kWh) costs roughly $29.65 before taxes and idle fees.
Location and access
- Address
- 265 Richardson Hwy
Delta Junction, AK 99737 - Coordinates
- 64.03241, -145.73188
- Finding the chargers
- Alaska Steakhouse parking lot
- Hours
- 24/7
- Phone
- 720-833-1479
- On site
- 24/7 Access
Questions drivers ask
How fast is ReCharge Alaska - Delta Junction?
It delivers up to 120 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 43 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at ReCharge Alaska - Delta Junction?
The listed rate is $0.55/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $30 before taxes and idle fees.
What plugs does ReCharge Alaska - Delta Junction have?
2 × CCS1 (Combined Charging System) up to 120 kW; 2 × NACS (SAE J3400) up to 120 kW.
Is ReCharge Alaska - Delta Junction open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 326095. Last confirmed by the network on Aug 11, 2026; opened Jan 17, 2024.