Skip to content
ChargePulse
High-power DC FLO

Alabama Power - Headland - Business Office ULTRA

18011 Hwy 431 S, Headland, AL 36345

Max power
250.8 kW
High-power DC
Charging ports
2
CCS1
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Alabama Power - Headland - Business Office ULTRA is a DC fast-charging station run by FLO at 18011 Hwy 431 S in Headland, AL. It has 2 charging ports with CCS1 connectors and delivers up to 250.8 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~90mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 251 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The FLO app shows the live rate before you start.

Location and access

Address
18011 Hwy 431 S
Headland, AL 36345
Coordinates
31.33556, -85.33285
Hours
24/7
Highway
Hwy-431
Network
FLO
On site
24/7 Access

Questions drivers ask

How fast is Alabama Power - Headland - Business Office ULTRA?

It delivers up to 251 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Alabama Power - Headland - Business Office ULTRA?

FLO has not published a fixed price for this site. Rates are shown in the FLO app or on the charger screen before you start a session.

What plugs does Alabama Power - Headland - Business Office ULTRA have?

2 × CCS1 (Combined Charging System) up to 251 kW.

Is Alabama Power - Headland - Business Office ULTRA open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 384666. Last confirmed by the network on Oct 11, 2026; opened Feb 20, 2025.