Skip to content
ChargePulse
Ultra-fast DC Circuit électrique

BRCC - L’Étape

10002 rte 175, Stoneham et Tewkesbury, QC G3C 2N9

Max power
320 kW
Ultra-fast DC
Charging ports
20
CCS1, CHAdeMO, NACS
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

BRCC - L’Étape is a DC fast-charging station run by Circuit électrique at 10002 rte 175 in Stoneham et Tewkesbury, QC. It has 20 charging ports with CCS1, CHAdeMO and NACS connectors and delivers up to 320 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~145km

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

7 ports · 180 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

25 ports · 320 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NACS

6 ports · 190 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

Pricing

Price not listed

Prices can vary by time of day and membership. The Circuit électrique app shows the live rate before you start.

Location and access

Address
10002 rte 175
Stoneham et Tewkesbury, QC G3C 2N9
Coordinates
47.56020, -71.23043
Hours
Not listed
Highway
Route-175

Questions drivers ask

How fast is BRCC - L’Étape?

It delivers up to 320 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at BRCC - L’Étape?

Circuit électrique has not published a fixed price for this site. Rates are shown in the Circuit électrique app or on the charger screen before you start a session.

What plugs does BRCC - L’Étape have?

7 × CHAdeMO up to 180 kW; 25 × CCS1 (Combined Charging System) up to 320 kW; 6 × NACS (SAE J3400) up to 190 kW.

Is BRCC - L’Étape open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 304783. Last confirmed by the network on Oct 11, 2026; opened Jul 17, 2019.