Max power
240 kW
High-power DC
Charging ports
2
CCS1
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

BRCC AFF - Ste-Justine - Appalaches Ford is a DC fast-charging station run by Circuit électrique at 150, Québec 204 in Sainte-Justine, QC. It has 2 charging ports with CCS1 connectors and delivers up to 240 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~145km

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 240 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The Circuit électrique app shows the live rate before you start.

Location and access

Address
150, Québec 204
Sainte-Justine, QC G0R 1Y0
Coordinates
46.40210, -70.36054
Hours
Not listed

Questions drivers ask

How fast is BRCC AFF - Ste-Justine - Appalaches Ford?

It delivers up to 240 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at BRCC AFF - Ste-Justine - Appalaches Ford?

Circuit électrique has not published a fixed price for this site. Rates are shown in the Circuit électrique app or on the charger screen before you start a session.

What plugs does BRCC AFF - Ste-Justine - Appalaches Ford have?

2 × CCS1 (Combined Charging System) up to 240 kW.

Is BRCC AFF - Ste-Justine - Appalaches Ford open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 347955. Last confirmed by the network on Oct 11, 2026; opened Jun 14, 2024.