BRCC - Christophe Colomb - Complexe Claude Robillard
8810, Avenue Christophe Colomb, Montréal, QC H2M 2E7
- Max power
- 180.3 kW
- High-power DC
- Charging ports
- 10
- CCS1, CHAdeMO
- Price
- Price not listed
- Per network listing
- Hours
- Not listed
- Check before you go
BRCC - Christophe Colomb - Complexe Claude Robillard is a DC fast-charging station run by Circuit électrique at 8810, Avenue Christophe Colomb in Montréal, QC. It has 10 charging ports with CCS1 and CHAdeMO connectors and delivers up to 180.3 kw. Pricing is set by the network app.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~145km
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CHAdeMO
1 port · 50 kW
DC fast
An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.
Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.
CCS1
19 ports · 180 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Price not listed
Prices can vary by time of day and membership. The Circuit électrique app shows the live rate before you start.
Location and access
- Address
- 8810, Avenue Christophe Colomb
Montréal, QC H2M 2E7 - Coordinates
- 45.55331, -73.63301
- Hours
- Not listed
- Phone
- 855-999-8378
- Network
- Circuit électrique
Questions drivers ask
How fast is BRCC - Christophe Colomb - Complexe Claude Robillard?
It delivers up to 180 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at BRCC - Christophe Colomb - Complexe Claude Robillard?
Circuit électrique has not published a fixed price for this site. Rates are shown in the Circuit électrique app or on the charger screen before you start a session.
What plugs does BRCC - Christophe Colomb - Complexe Claude Robillard have?
1 × CHAdeMO up to 50 kW; 19 × CCS1 (Combined Charging System) up to 180 kW.
Is BRCC - Christophe Colomb - Complexe Claude Robillard open 24/7?
Hours are not listed. Access may follow the host location's opening hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 418158. Last confirmed by the network on Oct 11, 2026; opened Aug 16, 2025.