Skip to content
ChargePulse
DC fast Circuit électrique

BRCC - Chartierville - Centre communautaire

27, Rue Saint Jean Baptiste, Chartierville, QC J0B 1K0

Max power
119.7 kW
DC fast
Charging ports
2
CCS1, CHAdeMO
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

BRCC - Chartierville - Centre communautaire is a DC fast-charging station run by Circuit électrique at 27, Rue Saint Jean Baptiste in Chartierville, QC. It has 2 charging ports with CCS1 and CHAdeMO connectors and delivers up to 119.7 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~44min

Range added in 15 minutes

~98km

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 50 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

3 ports · 120 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The Circuit électrique app shows the live rate before you start.

Location and access

Address
27, Rue Saint Jean Baptiste
Chartierville, QC J0B 1K0
Coordinates
45.29837, -71.20320
Hours
Not listed

Questions drivers ask

How fast is BRCC - Chartierville - Centre communautaire?

It delivers up to 120 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 44 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at BRCC - Chartierville - Centre communautaire?

Circuit électrique has not published a fixed price for this site. Rates are shown in the Circuit électrique app or on the charger screen before you start a session.

What plugs does BRCC - Chartierville - Centre communautaire have?

1 × CHAdeMO up to 50 kW; 3 × CCS1 (Combined Charging System) up to 120 kW.

Is BRCC - Chartierville - Centre communautaire open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 377623. Last confirmed by the network on Oct 11, 2026; opened Feb 4, 2025.