Skip to content
ChargePulse
DC fast Evstart

Chestnut Hill Developments Recreation Complex

1867 Valley Farm Rd, Pickering, ON L1V 6K7

Max power
60 kW
DC fast
Charging ports
6
CCS1, J1772
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Chestnut Hill Developments Recreation Complex is a DC fast-charging station run by Evstart at 1867 Valley Farm Rd in Pickering, ON. It has 6 charging ports with CCS1 and J1772 connectors and delivers up to 60 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~63min

Range added in 15 minutes

~68km

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 60 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

4 ports · 8 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Evstart app shows the live rate before you start.

Location and access

Address
1867 Valley Farm Rd
Pickering, ON L1V 6K7
Coordinates
43.83929, -79.08039
Hours
Not listed
Network
Evstart

Questions drivers ask

How fast is Chestnut Hill Developments Recreation Complex?

It delivers up to 60 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 63 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Chestnut Hill Developments Recreation Complex?

Evstart has not published a fixed price for this site. Rates are shown in the Evstart app or on the charger screen before you start a session.

What plugs does Chestnut Hill Developments Recreation Complex have?

2 × CCS1 (Combined Charging System) up to 60 kW; 4 × J1772 (Type 1) up to 8 kW.

Is Chestnut Hill Developments Recreation Complex open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 455186. Last confirmed by the network on Oct 11, 2026; opened Mar 18, 2026.