Skip to content
ChargePulse
DC fast Hwisel

Hampton Inn

40 McPherson Dr, Nepanee, ON K7R 3K6

Max power
100 kW
DC fast
Charging ports
4
CCS1, J1772
Price
C$0.22-0.56/kWh
Per network listing
Hours
24/7
Open all day

Hampton Inn is a DC fast-charging station run by Hwisel at 40 McPherson Dr in Nepanee, ON. It has 4 charging ports with CCS1 and J1772 connectors and delivers up to 100 kw. Listed pricing is C$0.22-0.56/kWh, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~52min

Range added in 15 minutes

~82km

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 100 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

2 ports · 11 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

C$0.22-0.56/kWh

Network listing: “$0.22 per kWh for L2; $0.56 per kWh for DCFC”

A 10% to 80% session (about 54 kWh) costs roughly C$11.86 to C$30.18 before taxes and idle fees.

Location and access

Address
40 McPherson Dr
Nepanee, ON K7R 3K6
Coordinates
44.26098, -76.97124
Hours
24/7for guest use only
Network
Hwisel
On site
LodgingRestrooms24/7 Access

Questions drivers ask

How fast is Hampton Inn?

It delivers up to 100 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 52 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Hampton Inn?

The listed rate is C$0.22-0.56/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly C$12 to C$30 before taxes and idle fees.

What plugs does Hampton Inn have?

2 × CCS1 (Combined Charging System) up to 100 kW; 2 × J1772 (Type 1) up to 11 kW.

Is Hampton Inn open 24/7?

Yes, the network lists it as open 24 hours a day. Note: for guest use only.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 361757. Last confirmed by the network on Dec 12, 2025; opened Mar 11, 2024.