Skip to content
ChargePulse
High-power DC Jule

Matilda Hall

4421 Brinston Rd, Brinston, ON K0E 1C0

Max power
200 kW
High-power DC
Charging ports
3
CCS1, NACS
Price
C$0.48/kWh
Per network listing
Hours
24/7
Open all day

Matilda Hall is a DC fast-charging station run by Jule at 4421 Brinston Rd in Brinston, ON. It has 3 charging ports with CCS1 and NACS connectors and delivers up to 200 kw. Listed pricing is C$0.48/kWh, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~145km

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

3 ports · 200 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NACS

3 ports · 200 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

Pricing

C$0.48/kWh

Network listing: “$0.48 per kWh”

A 10% to 80% session (about 54 kWh) costs roughly C$25.87 before taxes and idle fees.

Location and access

Address
4421 Brinston Rd
Brinston, ON K0E 1C0
Coordinates
44.92322, -75.34597
Hours
24/7
Network
Jule
On site
24/7 Access

Questions drivers ask

How fast is Matilda Hall?

It delivers up to 200 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Matilda Hall?

The listed rate is C$0.48/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly C$26 before taxes and idle fees.

What plugs does Matilda Hall have?

3 × CCS1 (Combined Charging System) up to 200 kW; 3 × NACS (SAE J3400) up to 200 kW.

Is Matilda Hall open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 449677. Last confirmed by the network on Feb 13, 2026; opened Jan 16, 2026.