Metis N4 Construction
200 Main St, Winnipeg, MB R3C 1A8
- Max power
- Up to 200 kW
- High-power DC
- Charging ports
- 8
- CCS1, J1772
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
Metis N4 Construction is a DC fast-charging station run by Independent at 200 Main St in Winnipeg, MB. It has 8 charging ports with CCS1 and J1772 connectors and delivers up to 200 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~145km
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
4 ports · 200 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
J1772
4 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Independent app shows the live rate before you start.
Location and access
- Address
- 200 Main St
Winnipeg, MB R3C 1A8 - Coordinates
- 53.82140, -101.24953
- Hours
- 24/7
- Phone
- 204-586-8474
- On site
- 24/7 Access
Questions drivers ask
How fast is Metis N4 Construction?
It delivers up to 200 kW (estimated from the network's typical hardware). A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Metis N4 Construction?
Independent has not published a fixed price for this site. Rates are shown in the Independent app or on the charger screen before you start a session.
What plugs does Metis N4 Construction have?
4 × CCS1 (Combined Charging System) up to 200 kW; 4 × J1772 (Type 1) up to 7 kW.
Is Metis N4 Construction open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 386581. Last confirmed by the network on Feb 13, 2026; opened Sep 30, 2024.