Skip to content
ChargePulse
High-power DC Independent

Metis N4 Construction

200 Main St, Winnipeg, MB R3C 1A8

Max power
Up to 200 kW
High-power DC
Charging ports
8
CCS1, J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Metis N4 Construction is a DC fast-charging station run by Independent at 200 Main St in Winnipeg, MB. It has 8 charging ports with CCS1 and J1772 connectors and delivers up to 200 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~145km

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

4 ports · 200 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

4 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Independent app shows the live rate before you start.

Location and access

Address
200 Main St
Winnipeg, MB R3C 1A8
Coordinates
53.82140, -101.24953
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is Metis N4 Construction?

It delivers up to 200 kW (estimated from the network's typical hardware). A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Metis N4 Construction?

Independent has not published a fixed price for this site. Rates are shown in the Independent app or on the charger screen before you start a session.

What plugs does Metis N4 Construction have?

4 × CCS1 (Combined Charging System) up to 200 kW; 4 × J1772 (Type 1) up to 7 kW.

Is Metis N4 Construction open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 386581. Last confirmed by the network on Feb 13, 2026; opened Sep 30, 2024.