District Main P1 68-69
4453 Main Street, Vancouver, BC V5V 0A2
- Max power
- 9.6 kW
- DC fast
- Charging ports
- 2
- J1772, NACS
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
District Main P1 68-69 is a DC fast-charging station run by ChargePoint at 4453 Main Street in Vancouver, BC. It has 2 charging ports with J1772 and NACS connectors and delivers up to 9.6 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~396min
Range added in 15 minutes
~11km
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
NACS
2 ports · 10 kW
DC fast
The North American Charging Standard, Tesla's plug, now adopted by most automakers.
Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.
J1772
2 ports · 10 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.
Location and access
- Address
- 4453 Main Street
Vancouver, BC V5V 0A2 - Coordinates
- 49.24501, -123.10165
- Finding the chargers
- Parkade Height Clearance 7'6, Entrance Through Back Lane, No Public Access Overnight (11:00 PM - 7:00 AM)
- Hours
- 24/7
- Phone
- 888-758-4389
- Network
- ChargePoint
- On site
- 24/7 Access
Questions drivers ask
How fast is District Main P1 68-69?
It delivers up to 10 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 396 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at District Main P1 68-69?
ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.
What plugs does District Main P1 68-69 have?
2 × NACS (SAE J3400) up to 10 kW; 2 × J1772 (Type 1) up to 10 kW.
Is District Main P1 68-69 open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 450137. Last confirmed by the network on Oct 10, 2026; opened Jan 27, 2026.