BC Hydro - Port McNeill
1705 Campbell Way, Port McNeill, BC V0N 2R0
- Max power
- 100 kW
- DC fast
- Charging ports
- 2
- CCS1, CHAdeMO
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
BC Hydro - Port McNeill is a DC fast-charging station run by Bchydro at 1705 Campbell Way in Port McNeill, BC. It has 2 charging ports with CCS1 and CHAdeMO connectors and delivers up to 100 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~52min
Range added in 15 minutes
~82km
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CHAdeMO
2 ports · 100 kW
DC fast
An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.
Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.
CCS1
2 ports · 100 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Price not listed
Prices can vary by time of day and membership. The Bchydro app shows the live rate before you start.
Location and access
- Address
- 1705 Campbell Way
Port McNeill, BC V0N 2R0 - Coordinates
- 50.58820, -127.08600
- Hours
- 24/7
- Phone
- 866-338-3369
- Network
- Bchydro
- On site
- 24/7 Access
Questions drivers ask
How fast is BC Hydro - Port McNeill?
It delivers up to 100 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 52 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at BC Hydro - Port McNeill?
Bchydro has not published a fixed price for this site. Rates are shown in the Bchydro app or on the charger screen before you start a session.
What plugs does BC Hydro - Port McNeill have?
2 × CHAdeMO up to 100 kW; 2 × CCS1 (Combined Charging System) up to 100 kW.
Is BC Hydro - Port McNeill open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 156687. Last confirmed by the network on Oct 11, 2026; opened Aug 11, 2020.