Skip to content
ChargePulse
Ultra-fast DC Bchydro

BC Hydro - Britton Creek - Rest Area

Exit 228 Coquihalla Lakes Rd, Fraser Valley B, BC V0X 1L0

Max power
400 kW
Ultra-fast DC
Charging ports
10
CCS1, CHAdeMO, NACS
Price
Price not listed
Per network listing
Hours
24/7
Open all day

BC Hydro - Britton Creek - Rest Area is a DC fast-charging station run by Bchydro at Exit 228 Coquihalla Lakes Rd in Fraser Valley B, BC. It has 10 charging ports with CCS1, CHAdeMO and NACS connectors and delivers up to 400 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~145km

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

2 ports · 50 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

9 ports · 400 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NACS

1 port · 400 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

Pricing

Price not listed

Prices can vary by time of day and membership. The Bchydro app shows the live rate before you start.

Location and access

Address
Exit 228 Coquihalla Lakes Rd
Fraser Valley B, BC V0X 1L0
Coordinates
49.65168, -121.00111
Hours
24/7
Highway
Exit 228
Network
Bchydro
On site
24/7 Access

Questions drivers ask

How fast is BC Hydro - Britton Creek - Rest Area?

It delivers up to 400 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at BC Hydro - Britton Creek - Rest Area?

Bchydro has not published a fixed price for this site. Rates are shown in the Bchydro app or on the charger screen before you start a session.

What plugs does BC Hydro - Britton Creek - Rest Area have?

2 × CHAdeMO up to 50 kW; 9 × CCS1 (Combined Charging System) up to 400 kW; 1 × NACS (SAE J3400) up to 400 kW.

Is BC Hydro - Britton Creek - Rest Area open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 257281. Last confirmed by the network on Oct 11, 2026; opened Nov 5, 2020.