Discovery Honda - CS -1
6466 Bell McKinnon Rd, Duncan, BC V9L 6C1
- Max power
- 18.8 kW
- DC fast
- Charging ports
- 1
- CCS1
- Price
- Free
- No charging fee listed
- Hours
- See hours
- 9 AM - 5 PM; for client use only
Discovery Honda - CS -1 is a DC fast-charging station run by Hwisel at 6466 Bell McKinnon Rd in Duncan, BC. It has 1 charging port with CCS1 connectors and delivers up to 18.8 kw. Charging is free, and the site is open 9 AM - 5 PM; for client use only.
How long will charging take?
10% to 80%, 77 kWh battery
~202min
Range added in 15 minutes
~21km
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
1 port · 19 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Free
Network listing: “Free”
Location and access
- Address
- 6466 Bell McKinnon Rd
Duncan, BC V9L 6C1 - Coordinates
- 48.80488, -123.71565
- Hours
- 9 AM - 5 PM; for client use only
- Phone
- 250-739-4169
- Network
- Hwisel
- On site
- Restrooms
Questions drivers ask
How fast is Discovery Honda - CS -1?
It delivers up to 19 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 202 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Discovery Honda - CS -1?
Charging is listed as free. Parking fees or time limits may still apply.
What plugs does Discovery Honda - CS -1 have?
1 × CCS1 (Combined Charging System) up to 19 kW.
Is Discovery Honda - CS -1 open 24/7?
Listed hours: 9 AM - 5 PM; for client use only.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 327686. Last confirmed by the network on Dec 12, 2025; opened May 23, 2023.