Skip to content
ChargePulse
High-power DC Surecharge

Cross Iron Mills

261055 CrossIron Boulevard, Rocky View County, AB T4A 0V1

Max power
180 kW
High-power DC
Charging ports
8
CCS1, NACS
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Cross Iron Mills is a DC fast-charging station run by Surecharge at 261055 CrossIron Boulevard in Rocky View County, AB. It has 8 charging ports with CCS1 and NACS connectors and delivers up to 180 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~145km

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

6 ports · 180 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NACS

2 ports · 180 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

Pricing

Price not listed

Prices can vary by time of day and membership. The Surecharge app shows the live rate before you start.

Location and access

Address
261055 CrossIron Boulevard
Rocky View County, AB T4A 0V1
Coordinates
51.20220, -113.99083
Hours
Not listed
Network
Surecharge

Questions drivers ask

How fast is Cross Iron Mills?

It delivers up to 180 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Cross Iron Mills?

Surecharge has not published a fixed price for this site. Rates are shown in the Surecharge app or on the charger screen before you start a session.

What plugs does Cross Iron Mills have?

6 × CCS1 (Combined Charging System) up to 180 kW; 2 × NACS (SAE J3400) up to 180 kW.

Is Cross Iron Mills open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 455765. Last confirmed by the network on Oct 11, 2026; opened Mar 18, 2026.