Skip to content
ChargePulse
Level 2 Independent

Vernon Electric Co-op

110 Saugstad Rd, Westby, WI 54667

Max power
Up to 7.2 kW
Level 2
Charging ports
2
J1772
Price
Free
No charging fee listed
Hours
24/7
Open all day

Vernon Electric Co-op is a Level 2 station run by Independent at 110 Saugstad Rd in Westby, WI. It has 2 charging ports with J1772 connectors and delivers up to 7.2 kw. Charging is free, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~24mi

10% to 80%, 77 kWh battery

~8.3hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

2 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Free

Network listing: “Free”

Location and access

Address
110 Saugstad Rd
Westby, WI 54667
Coordinates
43.66834, -90.84500
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is Vernon Electric Co-op?

It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Vernon Electric Co-op?

Charging is listed as free. Parking fees or time limits may still apply.

What plugs does Vernon Electric Co-op have?

2 × J1772 (Type 1) up to 7 kW.

Is Vernon Electric Co-op open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 185007. Last confirmed by the network on Jan 13, 2026; opened Feb 8, 2021.