Chevron Parking Lot
507 E Main St, Battle Ground, WA 98604
- Max power
- 7 kW
- Level 2
- Charging ports
- 4
- J1772
- Price
- $0.42/kWh
- Per network listing
- Hours
- 24/7
- Open all day
Chevron Parking Lot is a Level 2 station run by Independent at 507 E Main St in Battle Ground, WA. It has 4 charging ports with J1772 connectors and delivers up to 7 kw. Listed pricing is $0.42/kWh, and the site is open 24 hours a day.
How long will charging take?
Range added per hour
~23mi
10% to 80%, 77 kWh battery
~8.6hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
4 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
$0.42/kWh
Network listing: “$0.42 per kWh”
A 10% to 80% session (about 54 kWh) costs roughly $22.64 before taxes and idle fees.
Location and access
- Address
- 507 E Main St
Battle Ground, WA 98604 - Coordinates
- 45.78079, -122.53159
- Hours
- 24/7
- Phone
- 360-666-8735
- On site
- Convenience Store24/7 Access
Questions drivers ask
How fast is Chevron Parking Lot?
It is a Level 2 station delivering up to 7 kW, which adds roughly 23 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Chevron Parking Lot?
The listed rate is $0.42/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $23 before taxes and idle fees.
What plugs does Chevron Parking Lot have?
4 × J1772 (Type 1) up to 7 kW.
Is Chevron Parking Lot open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 356467. Last confirmed by the network on Jul 15, 2026; opened Sep 24, 2024.