Skip to content
ChargePulse
Level 2 Envirospark

Asana-Ford Building

280 400 W Rio Grande, Salt Lake City, UT 84101

Max power
11.1 kW
Level 2
Charging ports
4
J1772
Price
$0.40/kWh
Per network listing
Hours
24/7
Open all day

Asana-Ford Building is a Level 2 station run by Envirospark at 280 400 W Rio Grande in Salt Lake City, UT. It has 4 charging ports with J1772 connectors and delivers up to 11.1 kw. Listed pricing is $0.40/kWh, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~37mi

10% to 80%, 77 kWh battery

~5.4hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

4 ports · 11 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

$0.40/kWh

Network listing: “$0.40 per kWh”

A 10% to 80% session (about 54 kWh) costs roughly $21.56 before taxes and idle fees.

Location and access

Address
280 400 W Rio Grande
Salt Lake City, UT 84101
Coordinates
40.76328, -111.90283
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is Asana-Ford Building?

It is a Level 2 station delivering up to 11 kW, which adds roughly 37 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Asana-Ford Building?

The listed rate is $0.40/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $22 before taxes and idle fees.

What plugs does Asana-Ford Building have?

4 × J1772 (Type 1) up to 11 kW.

Is Asana-Ford Building open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 439082. Last confirmed by the network on Nov 13, 2025; opened Dec 31, 2024.