Skip to content
ChargePulse
Level 2 Independent

Holiday Inn Express & Suites- Morristown

2903 Millers Pointe Dr, Morristown, TN 37813

Max power
Up to 7.2 kW
Level 2
Charging ports
2
J1772
Price
Free
No charging fee listed
Hours
See hours
For guest use only

Holiday Inn Express & Suites- Morristown is a Level 2 station run by Independent at 2903 Millers Pointe Dr in Morristown, TN. It has 2 charging ports with J1772 connectors and delivers up to 7.2 kw. Charging is free, and the site is open For guest use only.

How long will charging take?

Range added per hour

~24mi

10% to 80%, 77 kWh battery

~8.3hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

2 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Free

Network listing: “Free”

Location and access

Address
2903 Millers Pointe Dr
Morristown, TN 37813
Coordinates
36.22543, -83.25626
Hours
For guest use only
On site
LodgingRestrooms

Questions drivers ask

How fast is Holiday Inn Express & Suites- Morristown?

It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Holiday Inn Express & Suites- Morristown?

Charging is listed as free. Parking fees or time limits may still apply.

What plugs does Holiday Inn Express & Suites- Morristown have?

2 × J1772 (Type 1) up to 7 kW.

Is Holiday Inn Express & Suites- Morristown open 24/7?

Listed hours: For guest use only.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 217041. Last confirmed by the network on Aug 11, 2026; opened May 2, 2022.