Skip to content
ChargePulse
Level 2 Blink

Mercato Grove

4055 Mercantile Drive, Lake Oswego, OR 97035

Max power
6.2 kW
Level 2
Charging ports
10
J1772
Price
$0.12/kWh
Per network listing
Hours
24/7
Open all day

Mercato Grove is a Level 2 station run by Blink at 4055 Mercantile Drive in Lake Oswego, OR. It has 10 charging ports with J1772 connectors and delivers up to 6.2 kw. Listed pricing is $0.12/kWh, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~20mi

10% to 80%, 77 kWh battery

~9.7hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

10 ports · 6 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

$0.12/kWh

Network listing: “$1.50-$3.50/Hr Variable Parking Fee, $0.12/kWh Energy Fee”

A 10% to 80% session (about 54 kWh) costs roughly $6.47 before taxes and idle fees.

Location and access

Address
4055 Mercantile Drive
Lake Oswego, OR 97035
Coordinates
45.41532, -122.71890
Hours
24/7
Network
Blink
On site
24/7 Access

Questions drivers ask

How fast is Mercato Grove?

It is a Level 2 station delivering up to 6 kW, which adds roughly 20 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Mercato Grove?

The listed rate is $0.12/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $6 before taxes and idle fees.

What plugs does Mercato Grove have?

10 × J1772 (Type 1) up to 6 kW.

Is Mercato Grove open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 191428. Last confirmed by the network on Oct 11, 2026; opened Dec 31, 2020.