Skip to content
ChargePulse
Level 2 Independent

City of Raleigh - Municipal Building

285 W Hargett St, Raleigh, NC 27601

Max power
Up to 7.2 kW
Level 2
Charging ports
2
J1772
Price
Free
No charging fee listed
Hours
24/7
Open all day

City of Raleigh - Municipal Building is a Level 2 station run by Independent at 285 W Hargett St in Raleigh, NC. It has 2 charging ports with J1772 connectors and delivers up to 7.2 kw. Charging is free, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~24mi

10% to 80%, 77 kWh battery

~8.3hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

2 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Free

Network listing: “Free; metered parking”

Location and access

Address
285 W Hargett St
Raleigh, NC 27601
Coordinates
35.77842, -78.64347
Finding the chargers
Street pay parking at the curb
Hours
24/7metered parking
On site
24/7 Access

Questions drivers ask

How fast is City of Raleigh - Municipal Building?

It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at City of Raleigh - Municipal Building?

Charging is listed as free (Free; metered parking). Parking fees or time limits may still apply.

What plugs does City of Raleigh - Municipal Building have?

2 × J1772 (Type 1) up to 7 kW.

Is City of Raleigh - Municipal Building open 24/7?

Yes, the network lists it as open 24 hours a day. Note: metered parking.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 39016. Last confirmed by the network on Jun 12, 2026; opened Oct 15, 2010.