Skip to content
ChargePulse
Level 2 Chargesmart Ev

Erie Station Village - South

251 Hendrix Rd, West Henrietta, NY 14586

Max power
7.2 kW
Level 2
Charging ports
6
J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Erie Station Village - South is a Level 2 station run by Chargesmart Ev at 251 Hendrix Rd in West Henrietta, NY. It has 6 charging ports with J1772 connectors and delivers up to 7.2 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~24mi

10% to 80%, 77 kWh battery

~8.3hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

6 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Chargesmart Ev app shows the live rate before you start.

Location and access

Address
251 Hendrix Rd
West Henrietta, NY 14586
Coordinates
43.04131, -77.66645
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is Erie Station Village - South?

It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Erie Station Village - South?

Chargesmart Ev has not published a fixed price for this site. Rates are shown in the Chargesmart Ev app or on the charger screen before you start a session.

What plugs does Erie Station Village - South have?

6 × J1772 (Type 1) up to 7 kW.

Is Erie Station Village - South open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 441020. Last confirmed by the network on Oct 11, 2026; opened Nov 13, 2025.