Skip to content
ChargePulse
Level 2 Vialynk

St. Lawrence Center

115 Torne Valley Road, Ramapo, NY 10931

Max power
6.7 kW
Level 2
Charging ports
8
J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

St. Lawrence Center is a Level 2 station run by Vialynk at 115 Torne Valley Road in Ramapo, NY. It has 8 charging ports with J1772 connectors and delivers up to 6.7 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~22mi

10% to 80%, 77 kWh battery

~8.9hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

8 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Vialynk app shows the live rate before you start.

Location and access

Address
115 Torne Valley Road
Ramapo, NY 10931
Coordinates
41.13814, -74.16217
Hours
24/7
Network
Vialynk
On site
24/7 Access

Questions drivers ask

How fast is St. Lawrence Center?

It is a Level 2 station delivering up to 7 kW, which adds roughly 22 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at St. Lawrence Center?

Vialynk has not published a fixed price for this site. Rates are shown in the Vialynk app or on the charger screen before you start a session.

What plugs does St. Lawrence Center have?

8 × J1772 (Type 1) up to 7 kW.

Is St. Lawrence Center open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 334471. Last confirmed by the network on Oct 11, 2026; opened May 2, 2024.