Port Jefferson Building 4
1500 NY-112, Port Jefferson Station, NY 11776
- Max power
- 6.6 kW
- Level 2
- Charging ports
- 4
- J1772
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
Port Jefferson Building 4 is a Level 2 station run by Vialynk at 1500 NY-112 in Port Jefferson Station, NY. It has 4 charging ports with J1772 connectors and delivers up to 6.6 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
Range added per hour
~22mi
10% to 80%, 77 kWh battery
~9.1hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
4 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Vialynk app shows the live rate before you start.
Location and access
- Address
- 1500 NY-112
Port Jefferson Station, NY 11776 - Coordinates
- 40.91001, -73.03039
- Hours
- 24/7
- Phone
- 833-611-5965
- Network
- Vialynk
- On site
- 24/7 Access
Questions drivers ask
How fast is Port Jefferson Building 4?
It is a Level 2 station delivering up to 7 kW, which adds roughly 22 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Port Jefferson Building 4?
Vialynk has not published a fixed price for this site. Rates are shown in the Vialynk app or on the charger screen before you start a session.
What plugs does Port Jefferson Building 4 have?
4 × J1772 (Type 1) up to 7 kW.
Is Port Jefferson Building 4 open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 459539. Last confirmed by the network on Oct 11, 2026; opened May 13, 2026.