Skip to content
ChargePulse
Level 2 EV Connect

Pearl River Train Station

19 South Main Street, Pearl River, NY 10965

Max power
7.2 kW
Level 2
Charging ports
4
J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Pearl River Train Station is a Level 2 station run by EV Connect at 19 South Main Street in Pearl River, NY. It has 4 charging ports with J1772 connectors and delivers up to 7.2 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~24mi

10% to 80%, 77 kWh battery

~8.3hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

4 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The EV Connect app shows the live rate before you start.

Location and access

Address
19 South Main Street
Pearl River, NY 10965
Coordinates
41.05878, -74.02213
Hours
24/7
Network
EV Connect
On site
24/7 Access

Questions drivers ask

How fast is Pearl River Train Station?

It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Pearl River Train Station?

EV Connect has not published a fixed price for this site. Rates are shown in the EV Connect app or on the charger screen before you start a session.

What plugs does Pearl River Train Station have?

4 × J1772 (Type 1) up to 7 kW.

Is Pearl River Train Station open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 155355. Last confirmed by the network on Oct 11, 2026; opened Apr 1, 2020.