Skip to content
ChargePulse
Level 2 Quickcharge

Integra Energy Headquarters

745 Albany Shaker Rd, Latham, NY 12110

Max power
11.5 kW
Level 2
Charging ports
4
J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Integra Energy Headquarters is a Level 2 station run by Quickcharge at 745 Albany Shaker Rd in Latham, NY. It has 4 charging ports with J1772 connectors and delivers up to 11.5 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~38mi

10% to 80%, 77 kWh battery

~5.2hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

4 ports · 12 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Quickcharge app shows the live rate before you start.

Location and access

Address
745 Albany Shaker Rd
Latham, NY 12110
Coordinates
42.74264, -73.81339
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is Integra Energy Headquarters?

It is a Level 2 station delivering up to 12 kW, which adds roughly 38 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Integra Energy Headquarters?

Quickcharge has not published a fixed price for this site. Rates are shown in the Quickcharge app or on the charger screen before you start a session.

What plugs does Integra Energy Headquarters have?

4 × J1772 (Type 1) up to 12 kW.

Is Integra Energy Headquarters open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 462045. Last confirmed by the network on Jul 15, 2026; opened May 8, 2026.