Skip to content
ChargePulse
Level 2 Vialynk

The Reserve at Glenville

100 Reserve Court, Glenville, NY 12302

Max power
6.7 kW
Level 2
Charging ports
10
J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

The Reserve at Glenville is a Level 2 station run by Vialynk at 100 Reserve Court in Glenville, NY. It has 10 charging ports with J1772 connectors and delivers up to 6.7 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~22mi

10% to 80%, 77 kWh battery

~8.9hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

10 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Vialynk app shows the live rate before you start.

Location and access

Address
100 Reserve Court
Glenville, NY 12302
Coordinates
42.83321, -73.93816
Finding the chargers
In front of Building 9
Hours
24/7
Network
Vialynk
On site
24/7 Access

Questions drivers ask

How fast is The Reserve at Glenville?

It is a Level 2 station delivering up to 7 kW, which adds roughly 22 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at The Reserve at Glenville?

Vialynk has not published a fixed price for this site. Rates are shown in the Vialynk app or on the charger screen before you start a session.

What plugs does The Reserve at Glenville have?

10 × J1772 (Type 1) up to 7 kW.

Is The Reserve at Glenville open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 324800. Last confirmed by the network on Oct 11, 2026; opened Sep 27, 2023.