Skip to content
ChargePulse
Level 2 Red E

Greater Binghamton Sports Center

1500 Airport Rd, Binghamton, NY 13905

Max power
9.6 kW
Level 2
Charging ports
6
J1772
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Greater Binghamton Sports Center is a Level 2 station run by Red E at 1500 Airport Rd in Binghamton, NY. It has 6 charging ports with J1772 connectors and delivers up to 9.6 kw. Pricing is set by the network app.

How long will charging take?

Range added per hour

~32mi

10% to 80%, 77 kWh battery

~6.2hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

6 ports · 10 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Red E app shows the live rate before you start.

Location and access

Address
1500 Airport Rd
Binghamton, NY 13905
Coordinates
42.15703, -75.94206
Hours
Not listed
Network
Red E

Questions drivers ask

How fast is Greater Binghamton Sports Center?

It is a Level 2 station delivering up to 10 kW, which adds roughly 32 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Greater Binghamton Sports Center?

Red E has not published a fixed price for this site. Rates are shown in the Red E app or on the charger screen before you start a session.

What plugs does Greater Binghamton Sports Center have?

6 × J1772 (Type 1) up to 10 kW.

Is Greater Binghamton Sports Center open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 466793. Last confirmed by the network on Oct 11, 2026; opened Aug 26, 2026.