Medford Cornerstone Urban Renewal
370 Stokes Road, Medford, NJ 08055
- Max power
- 16.6 kW
- Level 2
- Charging ports
- 4
- J1772
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
Medford Cornerstone Urban Renewal is a Level 2 station run by Blink at 370 Stokes Road in Medford, NJ. It has 4 charging ports with J1772 connectors and delivers up to 16.6 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
Range added per hour
~38mi
10% to 80%, 77 kWh battery
~5.2hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
4 ports · 17 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Blink app shows the live rate before you start.
Location and access
- Address
- 370 Stokes Road
Medford, NJ 08055 - Coordinates
- 39.88292, -74.82172
- Hours
- 24/7
- Phone
- 888-998-2546
- Network
- Blink
- On site
- 24/7 Access
Questions drivers ask
How fast is Medford Cornerstone Urban Renewal?
It is a Level 2 station delivering up to 17 kW, which adds roughly 38 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Medford Cornerstone Urban Renewal?
Blink has not published a fixed price for this site. Rates are shown in the Blink app or on the charger screen before you start a session.
What plugs does Medford Cornerstone Urban Renewal have?
4 × J1772 (Type 1) up to 17 kW.
Is Medford Cornerstone Urban Renewal open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 331496. Last confirmed by the network on Oct 11, 2026; opened Dec 22, 2023.