Skip to content
ChargePulse
Level 2 Ampup

HRP Construction River Street

210 River St, Hackensack, NJ 07601

Max power
Up to 7.2 kW
Level 2
Charging ports
4
J1772
Price
Price not listed
Per network listing
Hours
See hours
Contact station for hours of availability

HRP Construction River Street is a Level 2 station run by Ampup at 210 River St in Hackensack, NJ. It has 4 charging ports with J1772 connectors and delivers up to 7.2 kw. Pricing is set by the network app.

How long will charging take?

Range added per hour

~24mi

10% to 80%, 77 kWh battery

~8.3hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

4 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Ampup app shows the live rate before you start.

Location and access

Address
210 River St
Hackensack, NJ 07601
Coordinates
40.88421, -74.04043
Hours
Contact station for hours of availability
Network
Ampup

Questions drivers ask

How fast is HRP Construction River Street?

It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at HRP Construction River Street?

Ampup has not published a fixed price for this site. Rates are shown in the Ampup app or on the charger screen before you start a session.

What plugs does HRP Construction River Street have?

4 × J1772 (Type 1) up to 7 kW.

Is HRP Construction River Street open 24/7?

Listed hours: Contact station for hours of availability.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 262125. Last confirmed by the network on Jun 12, 2023; opened Apr 4, 2023.