Skip to content
ChargePulse
Level 2 Evgateway

LV Airport T3 - North

5757 Wayne Newton Blvd, Las Vegas, NV 89119

Max power
9.6 kW
Level 2
Charging ports
6
J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

LV Airport T3 - North is a Level 2 station run by Evgateway at 5757 Wayne Newton Blvd in Las Vegas, NV. It has 6 charging ports with J1772 connectors and delivers up to 9.6 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~32mi

10% to 80%, 77 kWh battery

~6.2hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

6 ports · 10 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Evgateway app shows the live rate before you start.

Location and access

Address
5757 Wayne Newton Blvd
Las Vegas, NV 89119
Coordinates
36.08400, -115.15374
Hours
24/7
Network
Evgateway
On site
24/7 Access

Questions drivers ask

How fast is LV Airport T3 - North?

It is a Level 2 station delivering up to 10 kW, which adds roughly 32 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at LV Airport T3 - North?

Evgateway has not published a fixed price for this site. Rates are shown in the Evgateway app or on the charger screen before you start a session.

What plugs does LV Airport T3 - North have?

6 × J1772 (Type 1) up to 10 kW.

Is LV Airport T3 - North open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 376424. Last confirmed by the network on Oct 11, 2026; opened Jan 28, 2025.