Skip to content
ChargePulse
Level 2 Independent

Northwest Rural Public Power District

5613 State Highway 87, Hay Springs, NE 69347

Max power
Up to 7.2 kW
Level 2
Charging ports
2
J1772
Price
Free
No charging fee listed
Hours
24/7
Open all day

Northwest Rural Public Power District is a Level 2 station run by Independent at 5613 State Highway 87 in Hay Springs, NE. It has 2 charging ports with J1772 connectors and delivers up to 7.2 kw. Charging is free, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~24mi

10% to 80%, 77 kWh battery

~8.3hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

2 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Free

Network listing: “Free”

Location and access

Address
5613 State Highway 87
Hay Springs, NE 69347
Coordinates
42.67358, -102.69550
Hours
24/7
Highway
Hwy-87
On site
24/7 Access

Questions drivers ask

How fast is Northwest Rural Public Power District?

It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Northwest Rural Public Power District?

Charging is listed as free. Parking fees or time limits may still apply.

What plugs does Northwest Rural Public Power District have?

2 × J1772 (Type 1) up to 7 kW.

Is Northwest Rural Public Power District open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 202934. Last confirmed by the network on May 12, 2026; opened Nov 30, 2021.