Skip to content
ChargePulse
Level 2 Vialynk Temporarily unavailable

Hilton Garden Inn Canton

110 Royall Street, Canton, MA 02021

Max power
6.6 kW
Level 2
Charging ports
10
J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Hilton Garden Inn Canton is a Level 2 station run by Vialynk at 110 Royall Street in Canton, MA. It has 10 charging ports with J1772 connectors and delivers up to 6.6 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

Range added per hour

~22mi

10% to 80%, 77 kWh battery

~9.1hours

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

J1772

10 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Vialynk app shows the live rate before you start.

Location and access

Address
110 Royall Street
Canton, MA 02021
Coordinates
42.20665, -71.12713
Hours
24/7
Network
Vialynk
On site
24/7 Access

Questions drivers ask

How fast is Hilton Garden Inn Canton?

It is a Level 2 station delivering up to 7 kW, which adds roughly 22 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.

How much does it cost to charge at Hilton Garden Inn Canton?

Vialynk has not published a fixed price for this site. Rates are shown in the Vialynk app or on the charger screen before you start a session.

What plugs does Hilton Garden Inn Canton have?

10 × J1772 (Type 1) up to 7 kW.

Is Hilton Garden Inn Canton open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 355738. Last confirmed by the network on Oct 11, 2026; opened Sep 14, 2024.